Integrated Solution for Intelligent Jigging Process Coal and Gangue Separation
Category:
BUSINESS
Key words:
Intelligent jigging process coal preparation complete solution—highly efficient
energy-saving
and environmentally friendly; significantly reduces plant construction investment
shortens construction period
and offers flexible investment options.
Hotline:
Product details
I. The TTX Series Modular Intelligent Jigging Process Coal and Gangue Separation Complete Set of Equipment—the TTX Series Modular Intelligent Jigging Complete Set of Gangue Separation Equipment—represents a revolutionary breakthrough in the coal preparation industry, completely overturning traditional concepts of coal washing equipment layout. This equipment is suitable for coal and gangue separation plants with an annual processing capacity ranging from 1.5 million to 5 million tons.
Second, we adopt a tailored approach for each project, customizing equipment based on the characteristics of raw materials, water quality, and geographic and climatic conditions. Wo Heng is committed to providing energy customers with professional, scientific, and advanced modular, intelligent, turnkey coal and gangue washing and sorting solutions.
Previous
Previous
Intelligent Heavy Medium Coal Preparation Complete Solution
Recommended product
Three-stage jigging machine
Core technologies: stable flow, stable voltage, and thorough coal washing with no dead corners.
最新复合型稳流式数控跳汰(两段)
核心技术:稳流、稳压、洗煤无死角
CNC damper
Key features: Large air intake volume, instantaneous air supply and exhaust, low maintenance requirements, low power consumption, low noise level, and easy upgradeability.
Professional installation and commissioning operation to ensure the successful acceptance of the production line
According to customer needs, the installation engineers will guide the whole process of site infrastructure construction, equipment installation and commissioning and the trial operation of the entire production line. When the relevant project indicators meet the design standards, the customer will sign the project acceptance.
Installation preparation stage
Check and confirm the order, check the parts required by the equipment, and check the elevation and geometric size according to the drawings
Mechanical equipment installation stage
Plan the on-site installation according to the design diagram. Gradually install the mechanical equipment and related auxiliary equipment
Mechanical equipment test run stage
Further check the equipment and carry out the commissioning and maintenance before use to ensure that the operating characteristics of the equipment meet the needs of production
Device installation and acceptance phase
Design documents Factory certificate and inspection report equipment for main materials (manual, certificate, etc.)
Contact Us For Quotation
FAQ
Is it a source factory or a trading company? Does it have its own production workshop?
What types of washing and screening equipment do you mainly produce?
What is the lead time? Can you customize the opening, production capacity, and whether it's a mobile or fixed type?
Has the factory passed environmental impact assessment, safety certification, ISO, and other certifications?
What is the cooperation process? How are payment methods, packaging, and shipping arranged?
Can you customize equipment and provide non-standard designs? What is the strength of your technical team?